Costello Carpentry delivered commercial carpentry in Chicago for Switchyards’ newest club in Lincoln Park. We helped turn a former commercial space into a club where people want to work at any hour, building in phases from August through October 2026: new walls, drywall, four bathrooms, seven doors, trim, tile and sealed concrete floors.
4
New bathrooms
7
New doors, including a steel full-lite club room door
140 lf
About 140 linear feet of new 10-foot walls
2,850 sf
About 2,850 square feet of drywall, level 3 finish
720 lf
About 720 linear feet of trim
3,800 sf
About 3,800 square feet of sealed concrete
Figures are approximate, based on our project quotes.
The Client: Switchyards
Switchyards calls itself “The World’s First Neighborhood Work Club.” Each club blends a coffee shop, a library and a boutique hotel lobby, in residential neighborhoods rather than downtown office districts. Members get free coffee and tea, fast internet and bookable soundproof phone booths and club rooms. Every club is open 24/7.
The company started in Atlanta about a decade ago and now runs 41 clubs in 16 cities. Chicago is its biggest market, with clubs in Fulton Market, Logan Square and now Lincoln Park. Learn more at switchyards.com.
The Lincoln Park club sits in a historic building that was once an A&P supermarket and later an Army-Navy supply store. Block Club Chicago reported that the club opened on October 26, 2026.
The Project: Four Phases, August to October 2026
Costello Carpentry worked as the general carpenter on the buildout. The job ran in phases as the design came together.
Phase 1: Main buildout
Starting in August 2026: demolition and framing, drywall, four bathrooms, doors, trim and concrete sealing.
Phase 2: Plumbing
Late August: new copper hot and cold supply lines with ball valves to the four bathrooms and the coffee station, venting tied into the existing vent pipe, cast iron drains and drywall patching.
Phase 3: Tile
September: tile in the bathrooms, finished on September 30, 2026.
Phase 4: Change orders and final additions
September and October: scope changes as the design evolved, plus final details like a drain assembly for an owner-supplied sink.
What We Built
Framing and walls
About 140 linear feet of new 10-foot walls carved the open floor into lounges, meeting rooms and quiet spaces.
Drywall
About 2,850 square feet of 5/8-inch drywall, hung and finished to a level 3 finish, ready for paint.
Four new bathrooms
Each bathroom has its own door, toilet, sink and exhaust fan. We tiled them with red floor tile and matte black wall tile, with the wall tile set 6 feet high.
Seven doors
Four bathroom doors, a Field Ops door, a steel full-lite door for the club room, and the front entry door with threshold, stops and an electric strike for key fob access. See our door installation and repair work.
Trim and finish carpentry
About 720 linear feet of trim gave the rooms a warm, polished finish. More on our trim carpentry and door finishing and trim work.
Sealed concrete floors
About 3,800 square feet of concrete floor was sealed. See our flooring installation services.
Tile, plumbing and change orders
A dedicated tile phase for the bathrooms, new supply, vent and drain lines for the bathrooms and coffee station, and change orders handled as the design evolved. We also do bathroom tiling and bathroom remodeling.
Why This Project Matters
A club that never closes
Switchyards clubs are open 24/7, so doors, floors and bathrooms work around the clock. The steel club room door, sealed concrete and tile are built for that daily use.
An older commercial building
The space was once a supermarket and later an Army-Navy store. New plumbing had to tie into the existing vent pipe, and the walls had to turn one open floor into many different rooms.
A scope that kept growing
The job started as one buildout and became four phases, with change orders and final additions along the way. Each phase was quoted and scoped separately.
A very public opening
The photos show the club shortly before its October 26, 2026 opening. Memberships at the new Lincoln Park club sold out quickly after going on sale, according to Block Club Chicago.
Project Gallery
The finished Lincoln Park club. Click any photo to enlarge. The last four photos are courtesy of Switchyards and show its club interiors.
Commercial Buildouts With Costello: FAQ
Does Costello Carpentry take on commercial buildouts in Chicago?
Yes. Switchyards Lincoln Park is a good example: framing, drywall, bathrooms, doors, trim, tile and sealed concrete in one commercial space. Tell us about your space and we will tell you honestly whether it is a fit.
Can you work in phases?
Yes. The Switchyards job ran as a main buildout, a plumbing phase, a tile phase, and change orders and final additions. We scope each phase clearly so you always know what is next.
Can I hire you for just doors, trim or floors?
Yes. You can hire us for a single scope such as doors, trim, flooring or structural carpentry. We also take on larger, multi-phase carpentry projects.
How do I get an estimate for a commercial project?
Call (773) 397-7395 or email office@costellocarpentry.com, or use our contact page. Estimates are free, and the written estimate spells out exactly what is included.
Planning a Commercial Buildout in Chicago?
Tell us about your space. Call (773) 397-7395 or email office@costellocarpentry.com for a free estimate. See more of our work in the project portfolio or learn about building maintenance.